Allowance Review

Project: 3208 GLWA Oakwood CSO HVAC Upgrades STATEMENT OF PROBLEM: On the GLWA provided estimate form, CCC mistakenly included base bid budgets for roofing work within the allowance lines instead of in the base bid section. ROOT CAUSE: Misinterpretation of the allowance bid category which was "Roof Repairs". …

Concrete Scope Misses

STATEMENT OF PROBLEM: This project included masonry and concrete work. Masonry was carried but concrete work was missed. A new concrete ramp and stairs needed to be installed along with multiple floor drains that needed to be poured.  COURSE OF ACTION: CCC self performed this work and took care of all concrete …

Negative Air Pressure in Labs

STATEMENT OF PROBLEM: Relocation of the Analytical Lab to WRRF involved CCC adding on to the plants existing Lab. The existing Lab had been in use for many years and it never occurred to us to check the negative air pressure in the Existing Lab. It appears after further investigation that the existing Lab had never h…

VFD Miss /Electrictal Scope Coverage

STATEMENT OF PROBLEM: Part of the scope for the Analytical Lab project was to replace the existing AHU Motors, VFD''s, and Controls on the 2nd, 3rd, and 4th floor of the New Administration Building. The problem was that the control sub-contractor excluded it from their contract and the electricians contract stated "r…

Shaft Wall Mistake / Failed Inspection

STATEMENT OF PROBLEM: Part of our scope for the Relocation of the Analytical Lab to WRRF was to create a shaft from the roof to the second floor using existing dead space. This involved removing the floor on the 3rd and 4th floor to create the shaft. The shaft was roughly 5'' x 9'' and was used to bring the new suppl…

Automatic Door Openers

STATEMENT OF PROBLEM: A pair of Auto Openers located on the 1st floor were missed. The majority of our work consisted on the second floor and the 1st floor auto openers were overlooked. The problem with this pair of openers is that they mounted to existing aluminum doors and this was not something that we could self …

Cleaning Interior Construction Routes

STATEMENT OF PROBLEM: Our construction area was adjacent to GLWA office area. The elevators that were needed to get construction materials to the second floor exited into a elevator lobby. The elevator lobby was used by both the plant and construction teams and the floor was a polished Terrazzo floor. GLWA required C…

Demolition Pre-Con Meeting

STATEMENT OF PROBLEM: Demo sub-contractor (Bluestar) demolished two dishwashers that were to remain as is. Demo crew was strictly working off demo drawings and did not refer to other pages that showed dishwashers to remain. The two dishwashers were old and we doubt they even worked, however we were still held respons…