JOB #3346 Michigan Gas utility- Jackson STATEMENT OF PROBLEM: A compressor pad was erected and the compressor later installed. Cementitious grout was carried in the estimate, however the line item on our proposal indicated (furnish and provide grout at compressor pad". This application required epoxy grout and w…
STATEMENT OF PROBLEM: CCC performed deep pour of Micor epoxy grout between the press plates and the concrete piers, for 20 plates. The epoxy grout was required to have a compressive strength of 10,000PSI. CCC constructed a headbox and used safety cones for the pour, following procedure as provided by Micor rep. H…