STATEMENT OF PROBLEM: CCC performed deep pour of Micor epoxy grout between the press plates and the concrete piers, for 20 plates. The epoxy grout was required to have a compressive strength of 10,000PSI. CCC constructed a headbox and used safety cones for the pour, following procedure as provided by Micor rep. H…