CCC JOB #3303 StarPlus Energy Kokomo Battery Plant Site Logistics/ PreCon Planning STATEMENT OF PROBLEM: Insufficient laydown areas were provided for the scope of work to be performed. Additionally, temporary facilities and utilities were located in areas that required permanent facility installations, therefo…
STATEMENT OF PROBLEM Physical lay down space was less than desired. This is pretty common with press relocation work where the bay of work is the only space available for construction. Physical lay down space was less than desired. This is pretty common with press relocation work where the bay of work is the only…