Category/Trade: Construction/Installation Delivery Method: Design/Build Statement of Problem: Safely interfacing with flumes, trenches, and pits was a significant challenge at the GM Romulus Engine Plant. After demolition of the process equipment, there was a large number of open flumes that were approximat…
STATEMENT OF PROBLEM The lighting fixture designed for the press pit and tunnel lighting went through IBI and GM approval and the photometric calcs were discussed several times. However prior to installation, the electrical subcontractor realized that the fixture was not listed in GM OneSpec. Triangle notified CC…