Category/Trade: Construction/Installation Delivery Method: Design/Build Statement of Problem: Safely interfacing with flumes, trenches, and pits was a significant challenge at the GM Romulus Engine Plant. After demolition of the process equipment, there was a large number of open flumes that were approximat…