EOL Elec Platform Beam Supports
print icon

STATEMENT OF PROBLEM
Additional floor support is required to support the elec. platform. schedule delay as elec platform cannot be installed until floor is poured.

COURSE OF ACTION
Poured floor before installing platform (schedule delay).

LESSON LEARNED
Capture Pontiac AA0 solution and incorporate into drawings.