You are using an unsupported browser. Please update your browser to the latest version on or before July 31, 2020.
close
You are viewing the article in preview mode. It is not live at the moment.

Showing articles from 2990 tag

HVAC Equipment Structural Loads

Project Plan: Construction Delivery Method: EPC (Engineer Procure Construct) The weight of the HVAC units and LEF-1 central exhaust unit increased dramatically from 30% design level to IFC. Ultimately some additional steel reinforcing was required for supporting LEF-1 fans. This added cost to the project.

Fume Hood Liner Design

Project Phase: Construction Delivery Method: EPC (Engineer Procure Construct) Statement of Problem: The project has Mott Novaguard fume hoods located throughout the labs. These fume hoods were designed by the lab planning architect, Iron Horse, to have PVC interior liners. During project construction and when the …

DTE Laboratory - Facade Entrance Redesign

Project Phase:  Construction Delivery Method: EPC (Engineer Procure Construct) Statement of Problem: Throughout the design process DTE desired for a very simple and economical solution for the building''s shell and entrance. During the design of the core and shell, several options were presented for the e…

scroll to top icon