GM Pontiac Northeast Corner Grade Beam Issue

STATEMENT OF PROBLEM During design of the site, civil designed for an exterior grading elevation which was higher than the top of the grade beam elevation at the NE corner of the building. At this location there is a narrow gap between the building grade beam and the ring road (about 3''''). Originally a curb was no…

Excavation for Electrical Grounding

STATEMENT OF PROBLEM: There was a lack of coordination and clarification between CCC as the GC, and Blaze Contracting, as to who would carry the cost of excavation for electrical grounding. This project had a lot more in-ground grounding then any typical building due to the CMM application. This excavation was never …