STATEMENT OF PROBLEM: CCC was tasked to remove a slab on metal deck (SOMD) on the first floor of the hospital for installation of new structural steel to provide a stronger SOMD for the MRI machine to be installed. CCC marked the slab removal per the drawings and had the SOMD shored from below with 2 additi…