Failure to specify surveying requirements
print icon
  STATEMENT OF PROBLEM
Precision surveying requirements not clearly defined in contract documents; Contractor not performing as frequently with signed-off documentation between Owner-Contractor-AE. Unclear expectations to the contractor; potential cause for errors.

COURSE OF ACTION
None

LESSON LEARNED
Need to clarify the expectations more clearly in the documents. Should have a better sign-off process. Survey documents need to be accumulated and handed over to the Press Installer when the bay is turned over.