Job #3387 DEA Renovations STATEMENT OF PROBLEM: For this project, there were existing walls which had wall paper covering on them. The demolition contractor's scope included the removal of the wall paper, however, their scope was not detailed as to the extent of removing the wall paper, which led to most of the b…
Cost savings for changing the exterior of the wall envelope from typical clay-fired brick masonry to a prefabricated, insulated metal panel yields a savings.