Apr 29, 2021
18
STATEMENT OF PROBLEM For utilities at A-line there were descrepancies between the scope demolition/relocation photos and the final direction. When a scope item calls for a utility at a column to be "secured to column" that does not mean "relocate". COURSE OF ACTION N/A LESSON LEARNED May be best for GM to handle the scope of reworking existing utilities by having an allowance at bid time, and then perform a final walkthrough to engineer the changes with a column coordination plan. That way there is no misinterpretation of the scope. |