May 10, 2021
55
Project Phase: Construction/Installation Delivery Method: General Contract-Prime We did not have a good plan for the floor cleaning requirements of the project. CCC was responsible for cleaning the floor slabs and eliminating the grease and oil. The team was not prepared for this level of cleaning at start of job, and this did not allow us to get the floor as clean as it should during the schedule constraints. |