8555-02 GM Detroit Factory Zero
STATEMENT OF PROBLEM
With the building not being perfect at 22'6" mid bay and 45' column to column
This caused some of the strut bracing to be either too short or too long.
ROOT CAUSE
We had figured that at some point in time the supplier designed their Mod sections around where the Strut Braces had to be installed and field checked for the condition of the building
COURSE OF ACTION
Had to remake strut braces to make sure the mod sections were properly supported and braced.
LESSON FOR FUTURE PROJECTS
Convince the customer to run one parallel header in line at truss level. This would solve all of the bracing issues.